FHWA NBI 2024 Inspection record Public-domain dataset

NEW ALIGNMENT

Carrying NEW ALIGNMENT over QUENSHUKENY RUN

NEW ALIGNMENT - QUENSHUKE, Lycoming, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
41 t Inventory load rating

Bridge Snapshot: NEW ALIGNMENT

The NEW ALIGNMENT bridge in Lycoming, Pennsylvania carries NEW ALIGNMENT over QUENSHUKENY RUN. It was built in 2019, making it 7 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 36.6 meters (120 feet) end to end. Daily traffic averages 210 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 40.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NEW ALIGNMENT compares

▲ 1.5
Load rating vs Pennsylvania average (39.3 t)
Top 39%
Higher load rating than 61% of Pennsylvania bridges
301
Bridges in Lycoming · 12 in Poor condition
NEW ALIGNMENT 40.8 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
100.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
40.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2019
Material
Prestressed Concrete
Number of Spans
1
Structure Length
36.6 m (120 ft)
Deck Width
9.5 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
210 vehicles/day
Structure Number
000000000056633

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether NEW ALIGNMENT is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NEW ALIGNMENT against other structures in Lycoming and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NEW ALIGNMENT?

NEW ALIGNMENT in Lycoming, Pennsylvania has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is NEW ALIGNMENT inspected?

NEW ALIGNMENT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 210 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NEW ALIGNMENT is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NEW ALIGNMENT?

NEW ALIGNMENT has an NBI inventory load rating of 40.8 metric tons.

Who is responsible for maintaining NEW ALIGNMENT?

NEW ALIGNMENT is owned and maintained by State Highway Agency.

How old is NEW ALIGNMENT and does age affect safety?

NEW ALIGNMENT was built in 2019, making it 7 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.