FHWA NBI 2024 Inspection record Public-domain dataset

ECHO AVE

Carrying ECHO AVE over HONEY CREEK

091050406, Clayton, Iowa

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
23 t Inventory load rating

Bridge Snapshot: ECHO AVE

The ECHO AVE bridge in Clayton, Iowa carries ECHO AVE over HONEY CREEK. It was built in 1951, making it 75 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 36.6 meters (120 feet) end to end. Daily traffic averages 39 vehicles, placing it in the lower-traffic tier of Iowa bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 22.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ECHO AVE compares

▼ 8.2
Load rating vs Iowa average (30.9 t)
Bottom 27%
Lower load rating than 73% of Iowa bridges
214
Bridges in Clayton · 21 in Poor condition
ECHO AVE 22.7 t
Iowa average 30.9 t

Live comparison across Iowa.

Historical Sufficiency Rating

PlainBridge-computed
69.2 / 100 - historical 50–79.9 band
Structural adequacy /55
35.2
Serviceability /30
21.0
Essentiality /15
15.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
22.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1951
Material
Steel Continuous
Number of Spans
3
Structure Length
36.6 m (120 ft)
Deck Width
6.7 m (22 ft)
Owner
County Highway Agency
Avg Daily Traffic
39 vehicles/day
Structure Number
000000000118470

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether ECHO AVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ECHO AVE against other structures in Clayton and across Iowa. Iowa bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ECHO AVE?

ECHO AVE in Clayton, Iowa has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is ECHO AVE inspected?

ECHO AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 39 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ECHO AVE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ECHO AVE?

ECHO AVE has an NBI inventory load rating of 22.7 metric tons.

Who is responsible for maintaining ECHO AVE?

ECHO AVE is owned and maintained by County Highway Agency.

How old is ECHO AVE and does age affect safety?

ECHO AVE was built in 1951, making it 75 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.