FHWA NBI 2024 Inspection record Public-domain dataset

CR 25

Carrying CR 25 over MILL CREEK

1.03 MILE SOUTH OF CR 21, Jackson, West Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
25 t Inventory load rating

Bridge Snapshot: CR 25

The CR 25 bridge in Jackson, West Virginia carries CR 25 over MILL CREEK. It was built in 1922, making it 104 years old today. It was last reconstructed in 1987, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 31.4 meters (103 feet) end to end. Daily traffic averages 2,400 vehicles, placing it in the moderately-trafficked tier of West Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 25 compares

▼ 16.5
Load rating vs West Virginia average (41.0 t)
Bottom 16%
Lower load rating than 84% of West Virginia bridges
192
Bridges in Jackson · 45 in Poor condition
CR 25 24.5 t
West Virginia average 41.0 t

Live comparison across West Virginia.

Historical Sufficiency Rating

PlainBridge-computed
40.8 / 100 - historical 20–49.9 band
Structural adequacy /55
22.8
Serviceability /30
3.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1922
Last Reconstructed
1987
Material
Steel
Number of Spans
1
Structure Length
31.4 m (103 ft)
Deck Width
5.9 m (19 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,400 vehicles/day
Structure Number
00000000018A108

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

CR 25 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CR 25 against other structures in Jackson and across West Virginia. West Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 25?

CR 25 in Jackson, West Virginia has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is CR 25 inspected?

CR 25's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,400 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 25 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 25?

CR 25 has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining CR 25?

CR 25 is owned and maintained by State Highway Agency.

How old is CR 25 and does age affect safety?

CR 25 was built in 1922, making it 104 years old and last reconstructed in 1987.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.