FHWA NBI 2024 Inspection record Public-domain dataset

MGL CO RT 26

Carrying MGL CO RT 26 over STEWART RUN

0.19 MI SOUTH CO RT 26/1, Monongalia, West Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
47 t Inventory load rating

Bridge Snapshot: MGL CO RT 26

The MGL CO RT 26 bridge in Monongalia, West Virginia carries MGL CO RT 26 over STEWART RUN. It was built in 2006, making it 20 years old today. The structure is built primarily of steel and spans 1 section, stretching 8.2 meters (27 feet) end to end. Daily traffic averages 90 vehicles, placing it in the lower-traffic tier of West Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 47.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MGL CO RT 26 compares

▲ 6.2
Load rating vs West Virginia average (41.0 t)
Top 35%
Higher load rating than 65% of West Virginia bridges
220
Bridges in Monongalia · 23 in Poor condition
MGL CO RT 26 47.2 t
West Virginia average 41.0 t

Live comparison across West Virginia.

Historical Sufficiency Rating

PlainBridge-computed
87.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
17.5
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
47.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2006
Material
Steel
Number of Spans
1
Structure Length
8.2 m (27 ft)
Deck Width
5.5 m (18 ft)
Owner
State Highway Agency
Avg Daily Traffic
90 vehicles/day
Structure Number
00000000031A297

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether MGL CO RT 26 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MGL CO RT 26 against other structures in Monongalia and across West Virginia. West Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MGL CO RT 26?

MGL CO RT 26 in Monongalia, West Virginia has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is MGL CO RT 26 inspected?

MGL CO RT 26's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 90 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MGL CO RT 26 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MGL CO RT 26?

MGL CO RT 26 has an NBI inventory load rating of 47.2 metric tons.

Who is responsible for maintaining MGL CO RT 26?

MGL CO RT 26 is owned and maintained by State Highway Agency.

How old is MGL CO RT 26 and does age affect safety?

MGL CO RT 26 was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.