FHWA NBI 2024 Inspection record Public-domain dataset

SW BUCHANAN AVE

Carrying SW BUCHANAN AVE over DRAINAGE

078082004, Johnson, Iowa

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
37 t Inventory load rating

Bridge Snapshot: SW BUCHANAN AVE

The SW BUCHANAN AVE bridge in Johnson, Iowa carries SW BUCHANAN AVE over DRAINAGE. It was built in 1974, making it 52 years old today. It was last reconstructed in 2018, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 12.2 meters (40 feet) end to end. Daily traffic averages 15 vehicles, placing it in the lower-traffic tier of Iowa bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 37.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SW BUCHANAN AVE compares

▲ 6.5
Load rating vs Iowa average (30.9 t)
Top 23%
Higher load rating than 77% of Iowa bridges
317
Bridges in Johnson · 26 in Poor condition
SW BUCHANAN AVE 37.4 t
Iowa average 30.9 t

Live comparison across Iowa.

Historical Sufficiency Rating

PlainBridge-computed
66.1 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
10.0
Essentiality /15
14.9
Special reductions
−3.8

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
37.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1974
Last Reconstructed
2018
Material
Steel
Number of Spans
1
Structure Length
12.2 m (40 ft)
Deck Width
4.6 m (15 ft)
Owner
County Highway Agency
Avg Daily Traffic
15 vehicles/day
Structure Number
000000000359275

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether SW BUCHANAN AVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SW BUCHANAN AVE against other structures in Johnson and across Iowa. Iowa bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SW BUCHANAN AVE?

SW BUCHANAN AVE in Johnson, Iowa has a deck rating of 7/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is SW BUCHANAN AVE inspected?

SW BUCHANAN AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 15 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SW BUCHANAN AVE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SW BUCHANAN AVE?

SW BUCHANAN AVE has an NBI inventory load rating of 37.4 metric tons.

Who is responsible for maintaining SW BUCHANAN AVE?

SW BUCHANAN AVE is owned and maintained by County Highway Agency.

How old is SW BUCHANAN AVE and does age affect safety?

SW BUCHANAN AVE was built in 1974, making it 52 years old and last reconstructed in 2018.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.