FHWA NBI 2024 Inspection record Public-domain dataset

PRESTON CR 26/21

Carrying PRESTON CR 26/21 over MUDDY CREEK

0.06 MI EAST WV RT 26, Preston, West Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
23 t Inventory load rating

Bridge Snapshot: PRESTON CR 26/21

The PRESTON CR 26/21 bridge in Preston, West Virginia carries PRESTON CR 26/21 over MUDDY CREEK. It was built in 1984, making it 42 years old today. The structure is built primarily of steel and spans 1 section, stretching 14.4 meters (47 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of West Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 22.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PRESTON CR 26/21 compares

▼ 18.3
Load rating vs West Virginia average (41.0 t)
Bottom 15%
Lower load rating than 85% of West Virginia bridges
184
Bridges in Preston · 38 in Poor condition
PRESTON CR 26/21 22.7 t
West Virginia average 41.0 t

Live comparison across West Virginia.

Historical Sufficiency Rating

PlainBridge-computed
62.2 / 100 - historical 50–79.9 band
Structural adequacy /55
35.2
Serviceability /30
12.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
22.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1984
Material
Steel
Number of Spans
1
Structure Length
14.4 m (47 ft)
Deck Width
4.2 m (14 ft)
Owner
State Highway Agency
Avg Daily Traffic
50 vehicles/day
Structure Number
00000000039A058

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PRESTON CR 26/21 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PRESTON CR 26/21 against other structures in Preston and across West Virginia. West Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PRESTON CR 26/21?

PRESTON CR 26/21 in Preston, West Virginia has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PRESTON CR 26/21 inspected?

PRESTON CR 26/21's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PRESTON CR 26/21 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PRESTON CR 26/21?

PRESTON CR 26/21 has an NBI inventory load rating of 22.7 metric tons.

Who is responsible for maintaining PRESTON CR 26/21?

PRESTON CR 26/21 is owned and maintained by State Highway Agency.

How old is PRESTON CR 26/21 and does age affect safety?

PRESTON CR 26/21 was built in 1984, making it 42 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.