FHWA NBI 2024 Inspection record Public-domain dataset

RELOC 110TH

Carrying RELOC 110TH over SUGAR CREEK

072132821, Wapello, Iowa

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating

Bridge Snapshot: RELOC 110TH

The RELOC 110TH bridge in Wapello, Iowa carries RELOC 110TH over SUGAR CREEK. It was built in 2005, making it 21 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 34.7 meters (114 feet) end to end. Daily traffic averages 1,370 vehicles, placing it in the moderately-trafficked tier of Iowa bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RELOC 110TH compares

▲ 1.8
Load rating vs Iowa average (30.9 t)
Top 44%
Higher load rating than 56% of Iowa bridges
160
Bridges in Wapello · 26 in Poor condition
RELOC 110TH 32.7 t
Iowa average 30.9 t

Live comparison across Iowa.

Historical Sufficiency Rating

PlainBridge-computed
94.1 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
14.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2005
Material
Prestressed Concrete
Number of Spans
1
Structure Length
34.7 m (114 ft)
Deck Width
12.6 m (41 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,370 vehicles/day
Structure Number
000000000504700

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether RELOC 110TH is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RELOC 110TH against other structures in Wapello and across Iowa. Iowa bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RELOC 110TH?

RELOC 110TH in Wapello, Iowa has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is RELOC 110TH inspected?

RELOC 110TH's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,370 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RELOC 110TH is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RELOC 110TH?

RELOC 110TH has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining RELOC 110TH?

RELOC 110TH is owned and maintained by County Highway Agency.

How old is RELOC 110TH and does age affect safety?

RELOC 110TH was built in 2005, making it 21 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.