FHWA NBI 2024 Inspection record Public-domain dataset

NC8

Carrying NC8 over NC8

0.4 MI. E. JCT. SR2212, Davidson, North Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: NC8

The NC8 bridge in Davidson, North Carolina carries NC8 over NC8. It was built in 2016, making it 10 years old today. The structure is built primarily of prestressed concrete continuous. Daily traffic averages 11,000 vehicles, placing it in the heavily-trafficked tier of North Carolina bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. All reported major components score above the Poor range.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NC8 compares

340
Bridges in Davidson · 10 in Poor condition

Live comparison across North Carolina.

Historical Sufficiency Rating

PlainBridge-computed
96.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
27.0
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2016
Material
Prestressed Concrete Continuous
Avg Daily Traffic
11,000 vehicles/day
Structure Number
000000000570424

How to read this record

This page shows what the last federal inspection recorded, not whether NC8 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NC8 against other structures in Davidson and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NC8?

NC8 in Davidson, North Carolina on the FHWA's 0–9 scale.

How often is NC8 inspected?

NC8's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NC8 is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NC8?

An inventory load rating is not recorded for NC8.

Who is responsible for maintaining NC8?

Ownership is not specified for NC8 in the NBI.

How old is NC8 and does age affect safety?

NC8 was built in 2016, making it 10 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.