US421
Carrying US421 over LITTLE CREEK
0.1 MI.W.JCT.I40, Forsyth, North Carolina
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: US421
The US421 bridge in Forsyth, North Carolina carries US421 over LITTLE CREEK. It was built in 1960, making it 66 years old today. It was last reconstructed in 1991, extending its service life. The structure is built primarily of concrete continuous and spans 3 sections, stretching 12.8 meters (42 feet) end to end. Daily traffic averages 62,000 vehicles, placing it in the heavily-trafficked tier of North Carolina bridges. It is owned and maintained by State Highway Agency.
The latest FHWA inspection records show culvert at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 32.6 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How US421 compares
Live comparison across North Carolina.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1960
- Last Reconstructed
- 1991
- Material
- Concrete Continuous
- Number of Spans
- 3
- Structure Length
- 12.8 m (42 ft)
- Owner
- State Highway Agency
- Avg Daily Traffic
- 62,000 vehicles/day
- Structure Number
- 000000000670246
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
US421 is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare US421 against other structures in Forsyth and across North Carolina. North Carolina bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for US421?
US421 in Forsyth, North Carolina on the FHWA's 0–9 scale.
How often is US421 inspected?
US421's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 62,000 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. US421 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for US421?
US421 has an NBI inventory load rating of 32.6 metric tons.
Who is responsible for maintaining US421?
US421 is owned and maintained by State Highway Agency.
How old is US421 and does age affect safety?
US421 was built in 1960, making it 66 years old and last reconstructed in 1991.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.