FHWA NBI 2024 Inspection record Public-domain dataset

OLD SH 10 SUMMIT

Carrying OLD SH 10 SUMMIT over BEAR GULCH CREEK

OLD STATE HWY 10, Schoharie, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
25 t Inventory load rating

Bridge Snapshot: OLD SH 10 SUMMIT

The OLD SH 10 SUMMIT bridge in Schoharie, New York carries OLD SH 10 SUMMIT over BEAR GULCH CREEK. It was built in 1906, making it 120 years old today. It was last reconstructed in 1957, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 7.6 meters (25 feet) end to end. Daily traffic averages 170 vehicles, placing it in the lower-traffic tier of New York bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OLD SH 10 SUMMIT compares

▼ 17.4
Load rating vs New York average (41.9 t)
Bottom 13%
Lower load rating than 87% of New York bridges
173
Bridges in Schoharie · 14 in Poor condition
OLD SH 10 SUMMIT 24.5 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
65.7 / 100 - historical 50–79.9 band
Structural adequacy /55
22.8
Serviceability /30
28.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1906
Last Reconstructed
1957
Material
Steel
Number of Spans
1
Structure Length
7.6 m (25 ft)
Deck Width
11.3 m (37 ft)
Owner
County Highway Agency
Avg Daily Traffic
170 vehicles/day
Structure Number
000000001007860

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

OLD SH 10 SUMMIT is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare OLD SH 10 SUMMIT against other structures in Schoharie and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OLD SH 10 SUMMIT?

OLD SH 10 SUMMIT in Schoharie, New York has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is OLD SH 10 SUMMIT inspected?

OLD SH 10 SUMMIT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 170 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OLD SH 10 SUMMIT is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OLD SH 10 SUMMIT?

OLD SH 10 SUMMIT has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining OLD SH 10 SUMMIT?

OLD SH 10 SUMMIT is owned and maintained by County Highway Agency.

How old is OLD SH 10 SUMMIT and does age affect safety?

OLD SH 10 SUMMIT was built in 1906, making it 120 years old and last reconstructed in 1957.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.