FHWA NBI 2024 Inspection record Public-domain dataset

RTE 11

Carrying RTE 11 over DORMAN CREEK

0.1 MI S JCT US 11 & SH 1, Broome, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
53 t Inventory load rating

Bridge Snapshot: RTE 11

The RTE 11 bridge in Broome, New York carries RTE 11 over DORMAN CREEK. It was built in 1983, making it 43 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 12.5 meters (41 feet) end to end. Daily traffic averages 23,757 vehicles, placing it in the heavily-trafficked tier of New York bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 52.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RTE 11 compares

▲ 10.7
Load rating vs New York average (41.9 t)
Top 22%
Higher load rating than 78% of New York bridges
512
Bridges in Broome · 11 in Poor condition
RTE 11 52.6 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
85.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
1.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
52.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1983
Material
Prestressed Concrete
Number of Spans
1
Structure Length
12.5 m (41 ft)
Deck Width
24.5 m (80 ft)
Owner
State Highway Agency
Avg Daily Traffic
23,757 vehicles/day
Structure Number
000000001008210

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether RTE 11 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RTE 11 against other structures in Broome and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RTE 11?

RTE 11 in Broome, New York has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is RTE 11 inspected?

RTE 11's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 23,757 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RTE 11 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RTE 11?

RTE 11 has an NBI inventory load rating of 52.6 metric tons.

Who is responsible for maintaining RTE 11?

RTE 11 is owned and maintained by State Highway Agency.

How old is RTE 11 and does age affect safety?

RTE 11 was built in 1983, making it 43 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.