FHWA NBI 2024 Inspection record Public-domain dataset

RTE 28N

Carrying RTE 28N over HUDSON RIVER

RT 28N 1 MI E OF NEWCOMB, Essex, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
41 t Inventory load rating

Bridge Snapshot: RTE 28N

The RTE 28N bridge in Essex, New York carries RTE 28N over HUDSON RIVER. It was built in 1996, making it 30 years old today. The structure is built primarily of steel and spans 1 section, stretching 60.4 meters (198 feet) end to end. Daily traffic averages 1,842 vehicles, placing it in the moderately-trafficked tier of New York bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 40.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RTE 28N compares

▼ 1.1
Load rating vs New York average (41.9 t)
Bottom 48%
Lower load rating than 52% of New York bridges
259
Bridges in Essex · 16 in Poor condition
RTE 28N 40.8 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
90.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
6.3
Special reductions
−0.8

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
40.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1996
Material
Steel
Number of Spans
1
Structure Length
60.4 m (198 ft)
Deck Width
11.0 m (36 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,842 vehicles/day
Structure Number
000000001020480

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether RTE 28N is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RTE 28N against other structures in Essex and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RTE 28N?

RTE 28N in Essex, New York has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is RTE 28N inspected?

RTE 28N's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,842 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RTE 28N is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RTE 28N?

RTE 28N has an NBI inventory load rating of 40.8 metric tons.

Who is responsible for maintaining RTE 28N?

RTE 28N is owned and maintained by State Highway Agency.

How old is RTE 28N and does age affect safety?

RTE 28N was built in 1996, making it 30 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.