FHWA NBI 2024 Inspection record Public-domain dataset

RTE 69

Carrying RTE 69 over E BRANCH FISH CRK

7.4 MI SE JCT SH13 & SH69, Oneida, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
55 t Inventory load rating

Bridge Snapshot: RTE 69

The RTE 69 bridge in Oneida, New York carries RTE 69 over E BRANCH FISH CRK. It was built in 2003, making it 23 years old today. The structure is built primarily of steel and spans 1 section, stretching 61.3 meters (201 feet) end to end. Daily traffic averages 6,957 vehicles, placing it in the moderately-trafficked tier of New York bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 55.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RTE 69 compares

▲ 13.4
Load rating vs New York average (41.9 t)
Top 18%
Higher load rating than 82% of New York bridges
509
Bridges in Oneida · 54 in Poor condition
RTE 69 55.3 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
84.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
55.3 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2003
Material
Steel
Number of Spans
1
Structure Length
61.3 m (201 ft)
Deck Width
13.3 m (44 ft)
Owner
State Highway Agency
Avg Daily Traffic
6,957 vehicles/day
Structure Number
000000001029370

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether RTE 69 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RTE 69 against other structures in Oneida and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RTE 69?

RTE 69 in Oneida, New York has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is RTE 69 inspected?

RTE 69's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,957 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RTE 69 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RTE 69?

RTE 69 has an NBI inventory load rating of 55.3 metric tons.

Who is responsible for maintaining RTE 69?

RTE 69 is owned and maintained by State Highway Agency.

How old is RTE 69 and does age affect safety?

RTE 69 was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.