FHWA NBI 2024 Inspection record Public-domain dataset

RTE 67

Carrying RTE 67 over CHUCTANUNDA CREEK

JCT OF SH 30 & SH 67, Montgomery, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
42 t Inventory load rating

Bridge Snapshot: RTE 67

The RTE 67 bridge in Montgomery, New York carries RTE 67 over CHUCTANUNDA CREEK. It was built in 1969, making it 57 years old today. The structure is built primarily of steel and spans 1 section, stretching 32.0 meters (105 feet) end to end. Daily traffic averages 18,669 vehicles, placing it in the heavily-trafficked tier of New York bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 41.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RTE 67 compares

▼ 0.2
Load rating vs New York average (41.9 t)
Top 45%
Higher load rating than 55% of New York bridges
208
Bridges in Montgomery · 19 in Poor condition
RTE 67 41.7 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
46.0 / 100 - historical 20–49.9 band
Structural adequacy /55
30.0
Serviceability /30
7.0
Essentiality /15
9.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
41.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1969
Material
Steel
Number of Spans
1
Structure Length
32.0 m (105 ft)
Deck Width
10.0 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
18,669 vehicles/day
Structure Number
000000001051910

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

RTE 67 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare RTE 67 against other structures in Montgomery and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RTE 67?

RTE 67 in Montgomery, New York has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is RTE 67 inspected?

RTE 67's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 18,669 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RTE 67 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RTE 67?

RTE 67 has an NBI inventory load rating of 41.7 metric tons.

Who is responsible for maintaining RTE 67?

RTE 67 is owned and maintained by State Highway Agency.

How old is RTE 67 and does age affect safety?

RTE 67 was built in 1969, making it 57 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.