FHWA NBI 2024 Inspection record Public-domain dataset

RTE I95

Carrying RTE I95 over RELIEF

JCT I95 & I278 & I295, Bronx, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
36 t Inventory load rating

Bridge Snapshot: RTE I95

The RTE I95 bridge in Bronx, New York carries RTE I95 over RELIEF. It was built in 1971, making it 55 years old today. It was last reconstructed in 2001, extending its service life. The structure is built primarily of steel and spans 6 sections, stretching 214.9 meters (705 feet) end to end. Daily traffic averages 112,258 vehicles, placing it in the heavily-trafficked tier of New York bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 36.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RTE I95 compares

▼ 5.6
Load rating vs New York average (41.9 t)
Bottom 39%
Lower load rating than 61% of New York bridges
394
Bridges in Bronx · 7 in Poor condition
RTE I95 36.3 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
84.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
0.0
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
36.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1971
Last Reconstructed
2001
Material
Steel
Number of Spans
6
Structure Length
214.9 m (705 ft)
Deck Width
11.0 m (36 ft)
Owner
State Highway Agency
Avg Daily Traffic
112,258 vehicles/day
Structure Number
00000000106650C

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether RTE I95 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RTE I95 against other structures in Bronx and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RTE I95?

RTE I95 in Bronx, New York has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is RTE I95 inspected?

RTE I95's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 112,258 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RTE I95 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RTE I95?

RTE I95 has an NBI inventory load rating of 36.3 metric tons.

Who is responsible for maintaining RTE I95?

RTE I95 is owned and maintained by State Highway Agency.

How old is RTE I95 and does age affect safety?

RTE I95 was built in 1971, making it 55 years old and last reconstructed in 2001.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.