FHWA NBI 2024 Inspection record Public-domain dataset

HRP SB RAMP

Carrying HRP SB RAMP over W.MAMARONECK RIVR

MAMARONECKAVE RAMPS TOHRP, Westchester, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
40 t Inventory load rating

Bridge Snapshot: HRP SB RAMP

The HRP SB RAMP bridge in Westchester, New York carries HRP SB RAMP over W.MAMARONECK RIVR. It was built in 1987, making it 39 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 14.6 meters (48 feet) end to end. Daily traffic averages 2,844 vehicles, placing it in the moderately-trafficked tier of New York bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 40.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HRP SB RAMP compares

▼ 1.7
Load rating vs New York average (41.9 t)
Bottom 48%
Lower load rating than 52% of New York bridges
854
Bridges in Westchester · 46 in Poor condition
HRP SB RAMP 40.2 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
98.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
14.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
40.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Prestressed Concrete
Number of Spans
1
Structure Length
14.6 m (48 ft)
Deck Width
16.8 m (55 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,844 vehicles/day
Structure Number
000000001073200

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether HRP SB RAMP is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HRP SB RAMP against other structures in Westchester and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HRP SB RAMP?

HRP SB RAMP in Westchester, New York has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is HRP SB RAMP inspected?

HRP SB RAMP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,844 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HRP SB RAMP is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HRP SB RAMP?

HRP SB RAMP has an NBI inventory load rating of 40.2 metric tons.

Who is responsible for maintaining HRP SB RAMP?

HRP SB RAMP is owned and maintained by State Highway Agency.

How old is HRP SB RAMP and does age affect safety?

HRP SB RAMP was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.