FHWA NBI 2024 Inspection record Public-domain dataset

NC86

Carrying NC86 over SOUTHERN RAILWAY

0.4 MI. S. JCT. I85, Orange, North Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
28 t Inventory load rating

Bridge Snapshot: NC86

The NC86 bridge in Orange, North Carolina carries NC86 over SOUTHERN RAILWAY. It was built in 1954, making it 72 years old today. The structure is built primarily of steel and spans 3 sections, stretching 37.1 meters (122 feet) end to end. Daily traffic averages 11,000 vehicles, placing it in the heavily-trafficked tier of North Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 3/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 28.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NC86 compares

▼ 16.1
Load rating vs North Carolina average (44.2 t)
Bottom 18%
Lower load rating than 82% of North Carolina bridges
189
Bridges in Orange · 12 in Poor condition
NC86 28.1 t
North Carolina average 44.2 t

Live comparison across North Carolina.

Historical Sufficiency Rating

PlainBridge-computed
21.8 / 100 - historical 20–49.9 band
Structural adequacy /55
12.1
Serviceability /30
5.0
Essentiality /15
4.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
3/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
28.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1954
Material
Steel
Number of Spans
3
Structure Length
37.1 m (122 ft)
Deck Width
9.5 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
11,000 vehicles/day
Structure Number
000000001350049

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates poor at 3/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

NC86 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare NC86 against other structures in Orange and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NC86?

NC86 in Orange, North Carolina has a deck rating of 5/9, superstructure rating of 3/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is NC86 inspected?

NC86's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NC86 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NC86?

NC86 has an NBI inventory load rating of 28.1 metric tons.

Who is responsible for maintaining NC86?

NC86 is owned and maintained by State Highway Agency.

How old is NC86 and does age affect safety?

NC86 was built in 1954, making it 72 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.