FHWA NBI 2024 Inspection record Public-domain dataset

I95N

Carrying I95N over LITTLE MARSH SWAMP

0.8 MI.N. OF JCT.SR1726, Robeson, North Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
20 t Inventory load rating

Bridge Snapshot: I95N

The I95N bridge in Robeson, North Carolina carries I95N over LITTLE MARSH SWAMP. It was built in 1959, making it 67 years old today. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 46.0 meters (151 feet) end to end. Daily traffic averages 27,750 vehicles, placing it in the heavily-trafficked tier of North Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 19.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I95N compares

▼ 24.3
Load rating vs North Carolina average (44.2 t)
Bottom 7%
Lower load rating than 93% of North Carolina bridges
285
Bridges in Robeson · 3 in Poor condition
I95N 19.9 t
North Carolina average 44.2 t

Live comparison across North Carolina.

Historical Sufficiency Rating

PlainBridge-computed
61.4 / 100 - historical 50–79.9 band
Structural adequacy /55
40.6
Serviceability /30
10.0
Essentiality /15
10.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
19.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1959
Material
Prestressed Concrete
Number of Spans
4
Structure Length
46.0 m (151 ft)
Deck Width
9.6 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
27,750 vehicles/day
Structure Number
000000001550164

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether I95N is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I95N against other structures in Robeson and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I95N?

I95N in Robeson, North Carolina has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I95N inspected?

I95N's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 27,750 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I95N is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I95N?

I95N has an NBI inventory load rating of 19.9 metric tons.

Who is responsible for maintaining I95N?

I95N is owned and maintained by State Highway Agency.

How old is I95N and does age affect safety?

I95N was built in 1959, making it 67 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.