BOYS CAMP ROAD
Carrying BOYS CAMP ROAD over ROCK CREEK
0.6 MI.E.JCT.US64, Rutherford, North Carolina
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: BOYS CAMP ROAD
The BOYS CAMP ROAD bridge in Rutherford, North Carolina carries BOYS CAMP ROAD over ROCK CREEK. It was built in 1938, making it 88 years old today. It was last reconstructed in 1983, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 9.1 meters (30 feet) end to end. Daily traffic averages 400 vehicles, placing it in the lower-traffic tier of North Carolina bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 30.8 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How BOYS CAMP ROAD compares
Live comparison across North Carolina.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1938
- Last Reconstructed
- 1983
- Material
- Prestressed Concrete
- Number of Spans
- 1
- Structure Length
- 9.1 m (30 ft)
- Deck Width
- 6.7 m (22 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 400 vehicles/day
- Structure Number
- 000000001610129
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
- • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
- • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.
How to read this record
This page shows what the last federal inspection recorded, not whether BOYS CAMP ROAD is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare BOYS CAMP ROAD against other structures in Rutherford and across North Carolina. North Carolina bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for BOYS CAMP ROAD?
BOYS CAMP ROAD in Rutherford, North Carolina has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is BOYS CAMP ROAD inspected?
BOYS CAMP ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 400 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. BOYS CAMP ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for BOYS CAMP ROAD?
BOYS CAMP ROAD has an NBI inventory load rating of 30.8 metric tons.
Who is responsible for maintaining BOYS CAMP ROAD?
BOYS CAMP ROAD is owned and maintained by City/Municipal Highway Agency.
How old is BOYS CAMP ROAD and does age affect safety?
BOYS CAMP ROAD was built in 1938, making it 88 years old and last reconstructed in 1983.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.