FHWA NBI 2024 Inspection record Public-domain dataset

SR2018

Carrying SR2018 over FLAT SHOAL CREEK

1.2 MI.W.JCT.SR2012, Surry, North Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating

Bridge Snapshot: SR2018

The SR2018 bridge in Surry, North Carolina carries SR2018 over FLAT SHOAL CREEK. It was built in 1968, making it 58 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 41.4 meters (136 feet) end to end. Daily traffic averages 400 vehicles, placing it in the lower-traffic tier of North Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 29.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR2018 compares

▼ 15.2
Load rating vs North Carolina average (44.2 t)
Bottom 19%
Lower load rating than 81% of North Carolina bridges
308
Bridges in Surry · 27 in Poor condition
SR2018 29.0 t
North Carolina average 44.2 t

Live comparison across North Carolina.

Historical Sufficiency Rating

PlainBridge-computed
54.3 / 100 - historical 50–79.9 band
Structural adequacy /55
28.0
Serviceability /30
14.3
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
29.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1968
Material
Prestressed Concrete
Number of Spans
3
Structure Length
41.4 m (136 ft)
Deck Width
7.5 m (25 ft)
Owner
State Highway Agency
Avg Daily Traffic
400 vehicles/day
Structure Number
000000001710131

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

SR2018 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR2018 against other structures in Surry and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR2018?

SR2018 in Surry, North Carolina has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is SR2018 inspected?

SR2018's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 400 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR2018 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR2018?

SR2018 has an NBI inventory load rating of 29.0 metric tons.

Who is responsible for maintaining SR2018?

SR2018 is owned and maintained by State Highway Agency.

How old is SR2018 and does age affect safety?

SR2018 was built in 1968, making it 58 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.