FHWA NBI 2024 Inspection record Public-domain dataset

SR1580

Carrying SR1580 over WILLIAMSON CREEK

.2 MI.E.JCT.SR1596, Transylvania, North Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
20 t Inventory load rating

Bridge Snapshot: SR1580

The SR1580 bridge in Transylvania, North Carolina carries SR1580 over WILLIAMSON CREEK. It was built in 1972, making it 54 years old today. It was last reconstructed in 1974, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 9.7 meters (32 feet) end to end. Daily traffic averages 200 vehicles, placing it in the lower-traffic tier of North Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 19.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR1580 compares

▼ 24.3
Load rating vs North Carolina average (44.2 t)
Bottom 7%
Lower load rating than 93% of North Carolina bridges
162
Bridges in Transylvania · 22 in Poor condition
SR1580 19.9 t
North Carolina average 44.2 t

Live comparison across North Carolina.

Historical Sufficiency Rating

PlainBridge-computed
46.6 / 100 - historical 20–49.9 band
Structural adequacy /55
30.6
Serviceability /30
12.0
Essentiality /15
12.0
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
19.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1972
Last Reconstructed
1974
Material
Steel
Number of Spans
1
Structure Length
9.7 m (32 ft)
Deck Width
6.7 m (22 ft)
Owner
State Highway Agency
Avg Daily Traffic
200 vehicles/day
Structure Number
000000001750228

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

SR1580 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR1580 against other structures in Transylvania and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR1580?

SR1580 in Transylvania, North Carolina has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is SR1580 inspected?

SR1580's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR1580 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR1580?

SR1580 has an NBI inventory load rating of 19.9 metric tons.

Who is responsible for maintaining SR1580?

SR1580 is owned and maintained by State Highway Agency.

How old is SR1580 and does age affect safety?

SR1580 was built in 1972, making it 54 years old and last reconstructed in 1974.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.