FHWA NBI 2024 Inspection record Public-domain dataset

PROSPECT JUNCTION

Carrying PROSPECT JUNCTION over CINCINNATI CREEK

3 MI N BARNEVELD, Oneida, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
44 t Inventory load rating

Bridge Snapshot: PROSPECT JUNCTION

The PROSPECT JUNCTION bridge in Oneida, New York carries PROSPECT JUNCTION over CINCINNATI CREEK. It was built in 1999, making it 27 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 13.7 meters (45 feet) end to end. Daily traffic averages 53 vehicles, placing it in the lower-traffic tier of New York bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 43.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PROSPECT JUNCTION compares

▲ 1.6
Load rating vs New York average (41.9 t)
Top 40%
Higher load rating than 60% of New York bridges
509
Bridges in Oneida · 54 in Poor condition
PROSPECT JUNCTION 43.5 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
83.0 / 100 - historical 80–100 band
Structural adequacy /55
45.0
Serviceability /30
23.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
43.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1999
Material
Prestressed Concrete
Number of Spans
1
Structure Length
13.7 m (45 ft)
Deck Width
5.5 m (18 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
53 vehicles/day
Structure Number
000000002206030

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether PROSPECT JUNCTION is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PROSPECT JUNCTION against other structures in Oneida and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PROSPECT JUNCTION?

PROSPECT JUNCTION in Oneida, New York has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is PROSPECT JUNCTION inspected?

PROSPECT JUNCTION's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 53 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PROSPECT JUNCTION is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PROSPECT JUNCTION?

PROSPECT JUNCTION has an NBI inventory load rating of 43.5 metric tons.

Who is responsible for maintaining PROSPECT JUNCTION?

PROSPECT JUNCTION is owned and maintained by Town/Township Highway Agency.

How old is PROSPECT JUNCTION and does age affect safety?

PROSPECT JUNCTION was built in 1999, making it 27 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.