FHWA NBI 2024 Inspection record Public-domain dataset

THACHER STREET

Carrying THACHER STREET over CANACADEA CREEK

IN HORNELL, Steuben, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
41 t Inventory load rating

Bridge Snapshot: THACHER STREET

The THACHER STREET bridge in Steuben, New York carries THACHER STREET over CANACADEA CREEK. It was built in 1995, making it 31 years old today. The structure is built primarily of steel and spans 1 section, stretching 39.9 meters (131 feet) end to end. Daily traffic averages 869 vehicles, placing it in the lower-traffic tier of New York bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 40.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How THACHER STREET compares

▼ 1.1
Load rating vs New York average (41.9 t)
Bottom 48%
Lower load rating than 52% of New York bridges
637
Bridges in Steuben · 25 in Poor condition
THACHER STREET 40.8 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
89.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
19.9
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
40.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1995
Material
Steel
Number of Spans
1
Structure Length
39.9 m (131 ft)
Deck Width
10.8 m (35 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
869 vehicles/day
Structure Number
000000002218180

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether THACHER STREET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare THACHER STREET against other structures in Steuben and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for THACHER STREET?

THACHER STREET in Steuben, New York has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is THACHER STREET inspected?

THACHER STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 869 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. THACHER STREET is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for THACHER STREET?

THACHER STREET has an NBI inventory load rating of 40.8 metric tons.

Who is responsible for maintaining THACHER STREET?

THACHER STREET is owned and maintained by City/Municipal Highway Agency.

How old is THACHER STREET and does age affect safety?

THACHER STREET was built in 1995, making it 31 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.