FHWA NBI 2024 Inspection record Public-domain dataset

GUY PARK AVE EXT

Carrying GUY PARK AVE EXT over N CHUCTANUNDA CK

IN AMSTERDAM, Montgomery, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
39 t Inventory load rating

Bridge Snapshot: GUY PARK AVE EXT

The GUY PARK AVE EXT bridge in Montgomery, New York carries GUY PARK AVE EXT over N CHUCTANUNDA CK. It was built in 1967, making it 59 years old today. The structure is built primarily of steel and spans 1 section, stretching 22.3 meters (73 feet) end to end. Daily traffic averages 1,520 vehicles, placing it in the moderately-trafficked tier of New York bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 39.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GUY PARK AVE EXT compares

▼ 2.9
Load rating vs New York average (41.9 t)
Bottom 45%
Lower load rating than 55% of New York bridges
208
Bridges in Montgomery · 19 in Poor condition
GUY PARK AVE EXT 39.0 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
61.7 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
16.9
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
39.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1967
Material
Steel
Number of Spans
1
Structure Length
22.3 m (73 ft)
Deck Width
11.3 m (37 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,520 vehicles/day
Structure Number
000000002255400

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

GUY PARK AVE EXT is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare GUY PARK AVE EXT against other structures in Montgomery and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GUY PARK AVE EXT?

GUY PARK AVE EXT in Montgomery, New York has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is GUY PARK AVE EXT inspected?

GUY PARK AVE EXT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,520 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GUY PARK AVE EXT is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GUY PARK AVE EXT?

GUY PARK AVE EXT has an NBI inventory load rating of 39.0 metric tons.

Who is responsible for maintaining GUY PARK AVE EXT?

GUY PARK AVE EXT is owned and maintained by City/Municipal Highway Agency.

How old is GUY PARK AVE EXT and does age affect safety?

GUY PARK AVE EXT was built in 1967, making it 59 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.