FHWA NBI 2024 Inspection record Public-domain dataset

GEDNEY WAY

Carrying GEDNEY WAY over EX-NYCRR PUTNAM B

1/4 MI EAST OF SH 125, Westchester, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
45 t Inventory load rating

Bridge Snapshot: GEDNEY WAY

The GEDNEY WAY bridge in Westchester, New York carries GEDNEY WAY over EX-NYCRR PUTNAM B. It was built in 1930, making it 96 years old today. It was last reconstructed in 1996, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 13.1 meters (43 feet) end to end. Daily traffic averages 5,923 vehicles, placing it in the moderately-trafficked tier of New York bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 44.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GEDNEY WAY compares

▲ 2.6
Load rating vs New York average (41.9 t)
Top 38%
Higher load rating than 62% of New York bridges
854
Bridges in Westchester · 46 in Poor condition
GEDNEY WAY 44.5 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
96.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
14.7
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
44.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1930
Last Reconstructed
1996
Material
Steel
Number of Spans
1
Structure Length
13.1 m (43 ft)
Deck Width
18.3 m (60 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
5,923 vehicles/day
Structure Number
000000002268640

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether GEDNEY WAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare GEDNEY WAY against other structures in Westchester and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GEDNEY WAY?

GEDNEY WAY in Westchester, New York has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is GEDNEY WAY inspected?

GEDNEY WAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,923 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GEDNEY WAY is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GEDNEY WAY?

GEDNEY WAY has an NBI inventory load rating of 44.5 metric tons.

Who is responsible for maintaining GEDNEY WAY?

GEDNEY WAY is owned and maintained by City/Municipal Highway Agency.

How old is GEDNEY WAY and does age affect safety?

GEDNEY WAY was built in 1930, making it 96 years old and last reconstructed in 1996.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.