FHWA NBI 2024 Inspection record Public-domain dataset

CHAPPEL RD

Carrying CHAPPEL RD over SANGERFIELD CREEK

1 MI NE HAMILTON, Madison, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
46 t Inventory load rating

Bridge Snapshot: CHAPPEL RD

The CHAPPEL RD bridge in Madison, New York carries CHAPPEL RD over SANGERFIELD CREEK. It was built in 1950, making it 76 years old today. The structure is built primarily of steel and spans 1 section, stretching 9.1 meters (30 feet) end to end. Daily traffic averages 35 vehicles, placing it in the lower-traffic tier of New York bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 46.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CHAPPEL RD compares

▲ 4.4
Load rating vs New York average (41.9 t)
Top 33%
Higher load rating than 67% of New York bridges
175
Bridges in Madison · 11 in Poor condition
CHAPPEL RD 46.3 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
84.0 / 100 - historical 80–100 band
Structural adequacy /55
45.0
Serviceability /30
26.0
Essentiality /15
15.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
46.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1950
Material
Steel
Number of Spans
1
Structure Length
9.1 m (30 ft)
Deck Width
7.8 m (26 ft)
Owner
County Highway Agency
Avg Daily Traffic
35 vehicles/day
Structure Number
000000002308600

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether CHAPPEL RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHAPPEL RD against other structures in Madison and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHAPPEL RD?

CHAPPEL RD in Madison, New York has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CHAPPEL RD inspected?

CHAPPEL RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 35 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHAPPEL RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHAPPEL RD?

CHAPPEL RD has an NBI inventory load rating of 46.3 metric tons.

Who is responsible for maintaining CHAPPEL RD?

CHAPPEL RD is owned and maintained by County Highway Agency.

How old is CHAPPEL RD and does age affect safety?

CHAPPEL RD was built in 1950, making it 76 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.