FHWA NBI 2024 Inspection record Public-domain dataset

OLD ROUTE 82

Carrying OLD ROUTE 82 over TAGHKANIC CREEK

0.9 MI S OF W TAGHKANIC, Columbia, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
41 t Inventory load rating

Bridge Snapshot: OLD ROUTE 82

The OLD ROUTE 82 bridge in Columbia, New York carries OLD ROUTE 82 over TAGHKANIC CREEK. It was built in 1922, making it 104 years old today. The structure is built primarily of steel and spans 2 sections, stretching 21.0 meters (69 feet) end to end. Daily traffic averages 134 vehicles, placing it in the lower-traffic tier of New York bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 40.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OLD ROUTE 82 compares

▼ 1.1
Load rating vs New York average (41.9 t)
Bottom 48%
Lower load rating than 52% of New York bridges
256
Bridges in Columbia · 40 in Poor condition
OLD ROUTE 82 40.8 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
48.5 / 100 - historical 20–49.9 band
Structural adequacy /55
30.0
Serviceability /30
5.5
Essentiality /15
15.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
40.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1922
Material
Steel
Number of Spans
2
Structure Length
21.0 m (69 ft)
Deck Width
7.2 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
134 vehicles/day
Structure Number
000000003222930

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

OLD ROUTE 82 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare OLD ROUTE 82 against other structures in Columbia and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OLD ROUTE 82?

OLD ROUTE 82 in Columbia, New York has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is OLD ROUTE 82 inspected?

OLD ROUTE 82's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 134 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OLD ROUTE 82 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OLD ROUTE 82?

OLD ROUTE 82 has an NBI inventory load rating of 40.8 metric tons.

Who is responsible for maintaining OLD ROUTE 82?

OLD ROUTE 82 is owned and maintained by County Highway Agency.

How old is OLD ROUTE 82 and does age affect safety?

OLD ROUTE 82 was built in 1922, making it 104 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.