FHWA NBI 2024 Inspection record Public-domain dataset

CR 35

Carrying CR 35 over HALFWAY CREEK

1mi W of 39 & 9L JCT, Washington, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
63 t Inventory load rating

Bridge Snapshot: CR 35

The CR 35 bridge in Washington, New York carries CR 35 over HALFWAY CREEK. It was built in 1931, making it 95 years old today. It was last reconstructed in 1985, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 13.4 meters (44 feet) end to end. Daily traffic averages 1,274 vehicles, placing it in the moderately-trafficked tier of New York bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 62.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 35 compares

▲ 20.7
Load rating vs New York average (41.9 t)
Top 10%
Higher load rating than 90% of New York bridges
193
Bridges in Washington · 26 in Poor condition
CR 35 62.6 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
84.3 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
15.1
Essentiality /15
14.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
62.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1931
Last Reconstructed
1985
Material
Steel
Number of Spans
1
Structure Length
13.4 m (44 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,274 vehicles/day
Structure Number
000000003306050

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether CR 35 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR 35 against other structures in Washington and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 35?

CR 35 in Washington, New York has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CR 35 inspected?

CR 35's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,274 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 35 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 35?

CR 35 has an NBI inventory load rating of 62.6 metric tons.

Who is responsible for maintaining CR 35?

CR 35 is owned and maintained by County Highway Agency.

How old is CR 35 and does age affect safety?

CR 35 was built in 1931, making it 95 years old and last reconstructed in 1985.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.