FHWA NBI 2024 Inspection record Public-domain dataset

CR233 EAST WINDSO

Carrying CR233 EAST WINDSO over TRIBUTARY to SUSQUEHANNA

4 MILES NORTHEAST WINDSOR, Broome, New York

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
44 t Inventory load rating

Bridge Snapshot: CR233 EAST WINDSO

The CR233 EAST WINDSO bridge in Broome, New York carries CR233 EAST WINDSO over TRIBUTARY to SUSQUEHANNA. It was built in 2015, making it 11 years old today. The structure is built primarily of concrete and spans 1 section, stretching 11.3 meters (37 feet) end to end. Daily traffic averages 270 vehicles, placing it in the lower-traffic tier of New York bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 43.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR233 EAST WINDSO compares

▲ 1.6
Load rating vs New York average (41.9 t)
Top 40%
Higher load rating than 60% of New York bridges
512
Bridges in Broome · 11 in Poor condition
CR233 EAST WINDSO 43.5 t
New York average 41.9 t

Live comparison across New York.

Historical Sufficiency Rating

PlainBridge-computed
83.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
43.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2015
Material
Concrete
Number of Spans
1
Structure Length
11.3 m (37 ft)
Deck Width
8.7 m (29 ft)
Owner
County Highway Agency
Avg Daily Traffic
270 vehicles/day
Structure Number
000000003349180

Condition Analysis

  • The deck (driving surface) is in good condition (9/9), showing no significant deterioration.
  • At 9/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (9/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CR233 EAST WINDSO is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR233 EAST WINDSO against other structures in Broome and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR233 EAST WINDSO?

CR233 EAST WINDSO in Broome, New York has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is CR233 EAST WINDSO inspected?

CR233 EAST WINDSO's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 270 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR233 EAST WINDSO is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR233 EAST WINDSO?

CR233 EAST WINDSO has an NBI inventory load rating of 43.5 metric tons.

Who is responsible for maintaining CR233 EAST WINDSO?

CR233 EAST WINDSO is owned and maintained by County Highway Agency.

How old is CR233 EAST WINDSO and does age affect safety?

CR233 EAST WINDSO was built in 2015, making it 11 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.