FHWA NBI 2024 Inspection record Public-domain dataset

TRUMAN PKY OFF RP/

Carrying TRUMAN PKY OFF RP/ over CASEY CANAL

NE INT DERENNE & WATERS, Chatham, Georgia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
37 t Inventory load rating

Bridge Snapshot: TRUMAN PKY OFF RP/

The TRUMAN PKY OFF RP/ bridge in Chatham, Georgia carries TRUMAN PKY OFF RP/ over CASEY CANAL. It was built in 1993, making it 33 years old today. The structure is built primarily of concrete and spans 5 sections, stretching 50.3 meters (165 feet) end to end. Daily traffic averages 2,870 vehicles, placing it in the moderately-trafficked tier of Georgia bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 37.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TRUMAN PKY OFF RP/ compares

▲ 3.0
Load rating vs Georgia average (34.1 t)
Top 21%
Higher load rating than 79% of Georgia bridges
269
Bridges in Chatham · 3 in Poor condition
TRUMAN PKY OFF RP/ 37.1 t
Georgia average 34.1 t

Live comparison across Georgia.

Historical Sufficiency Rating

PlainBridge-computed
94.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
37.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1993
Material
Concrete
Number of Spans
5
Structure Length
50.3 m (165 ft)
Deck Width
10.2 m (33 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
2,870 vehicles/day
Structure Number
000000005150340

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether TRUMAN PKY OFF RP/ is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TRUMAN PKY OFF RP/ against other structures in Chatham and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TRUMAN PKY OFF RP/?

TRUMAN PKY OFF RP/ in Chatham, Georgia has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is TRUMAN PKY OFF RP/ inspected?

TRUMAN PKY OFF RP/'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,870 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TRUMAN PKY OFF RP/ is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TRUMAN PKY OFF RP/?

TRUMAN PKY OFF RP/ has an NBI inventory load rating of 37.1 metric tons.

Who is responsible for maintaining TRUMAN PKY OFF RP/?

TRUMAN PKY OFF RP/ is owned and maintained by City/Municipal Highway Agency.

How old is TRUMAN PKY OFF RP/ and does age affect safety?

TRUMAN PKY OFF RP/ was built in 1993, making it 33 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.