TRUMAN PKY ON RMP
Carrying TRUMAN PKY ON RMP over PROPOSED CONSTRUCTION
0.3 MI NE OF SAVANNAH, Chatham, Georgia
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: TRUMAN PKY ON RMP
The TRUMAN PKY ON RMP bridge in Chatham, Georgia carries TRUMAN PKY ON RMP over PROPOSED CONSTRUCTION. It was built in 1997, making it 29 years old today. The structure is built primarily of prestressed concrete and spans 15 sections, stretching 189.0 meters (620 feet) end to end. Daily traffic averages 50,000 vehicles, placing it in the heavily-trafficked tier of Georgia bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 28.1 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How TRUMAN PKY ON RMP compares
Live comparison across Georgia.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1997
- Material
- Prestressed Concrete
- Number of Spans
- 15
- Structure Length
- 189.0 m (620 ft)
- Deck Width
- 14.6 m (48 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 50,000 vehicles/day
- Structure Number
- 000000005150490
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
- • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
- • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.
How to read this record
This page shows what the last federal inspection recorded, not whether TRUMAN PKY ON RMP is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare TRUMAN PKY ON RMP against other structures in Chatham and across Georgia. Georgia bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for TRUMAN PKY ON RMP?
TRUMAN PKY ON RMP in Chatham, Georgia has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is TRUMAN PKY ON RMP inspected?
TRUMAN PKY ON RMP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50,000 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. TRUMAN PKY ON RMP is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for TRUMAN PKY ON RMP?
TRUMAN PKY ON RMP has an NBI inventory load rating of 28.1 metric tons.
Who is responsible for maintaining TRUMAN PKY ON RMP?
TRUMAN PKY ON RMP is owned and maintained by City/Municipal Highway Agency.
How old is TRUMAN PKY ON RMP and does age affect safety?
TRUMAN PKY ON RMP was built in 1997, making it 29 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.