FHWA NBI 2024 Inspection record Public-domain dataset

NEW FOREST ROAD

Carrying NEW FOREST ROAD over OTTER CREEK

6 MI NE OF DOUGLAS, Coffee, Georgia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
34 t Inventory load rating

Bridge Snapshot: NEW FOREST ROAD

The NEW FOREST ROAD bridge in Coffee, Georgia carries NEW FOREST ROAD over OTTER CREEK. It was built in 2022, making it 4 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 45.7 meters (150 feet) end to end. Daily traffic averages 450 vehicles, placing it in the lower-traffic tier of Georgia bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 34.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NEW FOREST ROAD compares

▲ 0.3
Load rating vs Georgia average (34.1 t)
Top 28%
Higher load rating than 72% of Georgia bridges
126
Bridges in Coffee · 1 in Poor condition
NEW FOREST ROAD 34.4 t
Georgia average 34.1 t

Live comparison across Georgia.

Historical Sufficiency Rating

PlainBridge-computed
99.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
34.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2022
Material
Prestressed Concrete
Number of Spans
3
Structure Length
45.7 m (150 ft)
Deck Width
10.1 m (33 ft)
Owner
County Highway Agency
Avg Daily Traffic
450 vehicles/day
Structure Number
000000006950730

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether NEW FOREST ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NEW FOREST ROAD against other structures in Coffee and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NEW FOREST ROAD?

NEW FOREST ROAD in Coffee, Georgia has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is NEW FOREST ROAD inspected?

NEW FOREST ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 450 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NEW FOREST ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NEW FOREST ROAD?

NEW FOREST ROAD has an NBI inventory load rating of 34.4 metric tons.

Who is responsible for maintaining NEW FOREST ROAD?

NEW FOREST ROAD is owned and maintained by County Highway Agency.

How old is NEW FOREST ROAD and does age affect safety?

NEW FOREST ROAD was built in 2022, making it 4 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.