FHWA NBI 2024 Inspection record Public-domain dataset

W. NANCY CREEK DR.

Carrying W. NANCY CREEK DR. over NANCY CREEK TRIB

IN BROOKHAVEN, DeKalb, Georgia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
41 t Inventory load rating

Bridge Snapshot: W. NANCY CREEK DR.

The W. NANCY CREEK DR. bridge in DeKalb, Georgia carries W. NANCY CREEK DR. over NANCY CREEK TRIB. It was built in 1955, making it 71 years old today. It was last reconstructed in 1969, extending its service life. The structure is built primarily of steel and spans 3 sections, stretching 15.8 meters (52 feet) end to end. Daily traffic averages 20,300 vehicles, placing it in the heavily-trafficked tier of Georgia bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 40.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How W. NANCY CREEK DR. compares

▲ 6.7
Load rating vs Georgia average (34.1 t)
Top 16%
Higher load rating than 84% of Georgia bridges
448
Bridges in DeKalb · 6 in Poor condition
W. NANCY CREEK DR. 40.8 t
Georgia average 34.1 t

Live comparison across Georgia.

Historical Sufficiency Rating

PlainBridge-computed
63.0 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
0.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
40.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1955
Last Reconstructed
1969
Material
Steel
Number of Spans
3
Structure Length
15.8 m (52 ft)
Deck Width
7.7 m (25 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
20,300 vehicles/day
Structure Number
000000008950410

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether W. NANCY CREEK DR. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare W. NANCY CREEK DR. against other structures in DeKalb and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for W. NANCY CREEK DR.?

W. NANCY CREEK DR. in DeKalb, Georgia has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is W. NANCY CREEK DR. inspected?

W. NANCY CREEK DR.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. W. NANCY CREEK DR. is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for W. NANCY CREEK DR.?

W. NANCY CREEK DR. has an NBI inventory load rating of 40.8 metric tons.

Who is responsible for maintaining W. NANCY CREEK DR.?

W. NANCY CREEK DR. is owned and maintained by City/Municipal Highway Agency.

How old is W. NANCY CREEK DR. and does age affect safety?

W. NANCY CREEK DR. was built in 1955, making it 71 years old and last reconstructed in 1969.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.