FHWA NBI 2024 Inspection record Public-domain dataset

CLARENCE MARTIN RD

Carrying CLARENCE MARTIN RD over SOWHATCHEE CREEK

8.5 MI OF SW OF BLAKELY, Early, Georgia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
22 t Inventory load rating

Bridge Snapshot: CLARENCE MARTIN RD

The CLARENCE MARTIN RD bridge in Early, Georgia carries CLARENCE MARTIN RD over SOWHATCHEE CREEK. It was built in 1970, making it 56 years old today. It was last reconstructed in 2009, extending its service life. The structure is built primarily of prestressed concrete and spans 6 sections, stretching 45.7 meters (150 feet) end to end. Daily traffic averages 300 vehicles, placing it in the lower-traffic tier of Georgia bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 21.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CLARENCE MARTIN RD compares

▼ 12.4
Load rating vs Georgia average (34.1 t)
Bottom 17%
Lower load rating than 83% of Georgia bridges
85
Bridges in Early
CLARENCE MARTIN RD 21.7 t
Georgia average 34.1 t

Live comparison across Georgia.

Historical Sufficiency Rating

PlainBridge-computed
73.6 / 100 - historical 50–79.9 band
Structural adequacy /55
43.6
Serviceability /30
18.2
Essentiality /15
14.8
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
21.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Last Reconstructed
2009
Material
Prestressed Concrete
Number of Spans
6
Structure Length
45.7 m (150 ft)
Deck Width
7.7 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
300 vehicles/day
Structure Number
000000009950080

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CLARENCE MARTIN RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CLARENCE MARTIN RD against other structures in Early and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CLARENCE MARTIN RD?

CLARENCE MARTIN RD in Early, Georgia has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CLARENCE MARTIN RD inspected?

CLARENCE MARTIN RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CLARENCE MARTIN RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CLARENCE MARTIN RD?

CLARENCE MARTIN RD has an NBI inventory load rating of 21.7 metric tons.

Who is responsible for maintaining CLARENCE MARTIN RD?

CLARENCE MARTIN RD is owned and maintained by County Highway Agency.

How old is CLARENCE MARTIN RD and does age affect safety?

CLARENCE MARTIN RD was built in 1970, making it 56 years old and last reconstructed in 2009.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.