FHWA NBI 2024 Inspection record Public-domain dataset

SD028

Carrying SD028 over JAMES RV

2.6 W JCT SD 37, Spink, South Dakota

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
35 t Inventory load rating

Bridge Snapshot: SD028

The SD028 bridge in Spink, South Dakota carries SD028 over JAMES RV. It was built in 2013, making it 13 years old today. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 107.4 meters (352 feet) end to end. Daily traffic averages 363 vehicles, placing it in the lower-traffic tier of South Dakota bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 34.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SD028 compares

▲ 2.3
Load rating vs South Dakota average (32.5 t)
Top 31%
Higher load rating than 69% of South Dakota bridges
176
Bridges in Spink · 59 in Poor condition
SD028 34.8 t
South Dakota average 32.5 t

Live comparison across South Dakota.

Historical Sufficiency Rating

PlainBridge-computed
99.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
34.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2013
Material
Prestressed Concrete
Number of Spans
4
Structure Length
107.4 m (352 ft)
Deck Width
10.6 m (35 ft)
Owner
State Highway Agency
Avg Daily Traffic
363 vehicles/day
Structure Number
000000058214420

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SD028 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SD028 against other structures in Spink and across South Dakota. South Dakota bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SD028?

SD028 in Spink, South Dakota has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SD028 inspected?

SD028's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 363 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SD028 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SD028?

SD028 has an NBI inventory load rating of 34.8 metric tons.

Who is responsible for maintaining SD028?

SD028 is owned and maintained by State Highway Agency.

How old is SD028 and does age affect safety?

SD028 was built in 2013, making it 13 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.