FHWA NBI 2024 Inspection record Public-domain dataset

32 S 04 W 01.00:

Carrying 32 S 04 W 01.00: over COW CREEK

11.7 miles NE of I-5 (Exi, Douglas, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
28 t Inventory load rating

Bridge Snapshot: 32 S 04 W 01.00:

The 32 S 04 W 01.00: bridge in Douglas, Oregon carries 32 S 04 W 01.00: over COW CREEK. It was built in 1963, making it 63 years old today. The structure is built primarily of wood or timber and spans 3 sections, stretching 27.7 meters (91 feet) end to end. Daily traffic averages 30 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by Bureau of Land Management.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 28.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 32 S 04 W 01.00: compares

▼ 4.1
Load rating vs Oregon average (32.3 t)
Bottom 45%
Lower load rating than 55% of Oregon bridges
699
Bridges in Douglas · 22 in Poor condition
32 S 04 W 01.00: 28.2 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
78.1 / 100 - historical 50–79.9 band
Structural adequacy /55
52.2
Serviceability /30
11.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
28.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1963
Material
Wood or Timber
Number of Spans
3
Structure Length
27.7 m (91 ft)
Deck Width
4.9 m (16 ft)
Owner
Bureau of Land Management
Avg Daily Traffic
30 vehicles/day
Structure Number
0000000L1439159

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether 32 S 04 W 01.00: is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 32 S 04 W 01.00: against other structures in Douglas and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 32 S 04 W 01.00:?

32 S 04 W 01.00: in Douglas, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is 32 S 04 W 01.00: inspected?

32 S 04 W 01.00:'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 30 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 32 S 04 W 01.00: is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 32 S 04 W 01.00:?

32 S 04 W 01.00: has an NBI inventory load rating of 28.2 metric tons.

Who is responsible for maintaining 32 S 04 W 01.00:?

32 S 04 W 01.00: is owned and maintained by Bureau of Land Management.

How old is 32 S 04 W 01.00: and does age affect safety?

32 S 04 W 01.00: was built in 1963, making it 63 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.