FHWA NBI 2024 Inspection record Public-domain dataset

UPPER ACCESS ROAD

Carrying UPPER ACCESS ROAD over EAGLE CREEK

200' E OF OFFICE, Clackamas, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
14 t Inventory load rating

Bridge Snapshot: UPPER ACCESS ROAD

The UPPER ACCESS ROAD bridge in Clackamas, Oregon carries UPPER ACCESS ROAD over EAGLE CREEK. It was built in 1963, making it 63 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 31.1 meters (102 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by Bureau of Fish and Wildlife.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 13.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How UPPER ACCESS ROAD compares

▼ 18.7
Load rating vs Oregon average (32.3 t)
Bottom 6%
Lower load rating than 94% of Oregon bridges
367
Bridges in Clackamas · 9 in Poor condition
UPPER ACCESS ROAD 13.6 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
45.3 / 100 - historical 20–49.9 band
Structural adequacy /55
28.5
Serviceability /30
10.0
Essentiality /15
14.8
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
13.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1963
Material
Steel Continuous
Number of Spans
2
Structure Length
31.1 m (102 ft)
Deck Width
4.3 m (14 ft)
Owner
Bureau of Fish and Wildlife
Avg Daily Traffic
10 vehicles/day
Structure Number
000013280-00029

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether UPPER ACCESS ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare UPPER ACCESS ROAD against other structures in Clackamas and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for UPPER ACCESS ROAD?

UPPER ACCESS ROAD in Clackamas, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is UPPER ACCESS ROAD inspected?

UPPER ACCESS ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. UPPER ACCESS ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for UPPER ACCESS ROAD?

UPPER ACCESS ROAD has an NBI inventory load rating of 13.6 metric tons.

Who is responsible for maintaining UPPER ACCESS ROAD?

UPPER ACCESS ROAD is owned and maintained by Bureau of Fish and Wildlife.

How old is UPPER ACCESS ROAD and does age affect safety?

UPPER ACCESS ROAD was built in 1963, making it 63 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.