Main Entrance Rd
Carrying Main Entrance Rd over Unnamed Drainage
Main Entrance Rd., Cabo Rojo, Puerto Rico
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: Main Entrance Rd
The Main Entrance Rd bridge in Cabo Rojo, Puerto Rico carries Main Entrance Rd over Unnamed Drainage. It was built in 2011, making it 15 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 13.1 meters (43 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Puerto Rico bridges. It is owned and maintained by Bureau of Fish and Wildlife.
The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 20.0 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How Main Entrance Rd compares
Live comparison across Puerto Rico.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 2011
- Material
- Concrete
- Number of Spans
- 3
- Structure Length
- 13.1 m (43 ft)
- Deck Width
- 8.6 m (28 ft)
- Owner
- Bureau of Fish and Wildlife
- Avg Daily Traffic
- 100 vehicles/day
- Structure Number
- 000041521-63233
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether Main Entrance Rd is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare Main Entrance Rd against other structures in Cabo Rojo and across Puerto Rico. Puerto Rico bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for Main Entrance Rd?
Main Entrance Rd in Cabo Rojo, Puerto Rico on the FHWA's 0–9 scale.
How often is Main Entrance Rd inspected?
Main Entrance Rd's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. Main Entrance Rd is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for Main Entrance Rd?
Main Entrance Rd has an NBI inventory load rating of 20.0 metric tons.
Who is responsible for maintaining Main Entrance Rd?
Main Entrance Rd is owned and maintained by Bureau of Fish and Wildlife.
How old is Main Entrance Rd and does age affect safety?
Main Entrance Rd was built in 2011, making it 15 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.