FHWA NBI 2024 Inspection record Public-domain dataset

TP828

Carrying TP828 over LOCAL DRAINAGE

ENTRANCE TO T.P. ADMIN, Santa Fe, New Mexico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
90 t Inventory load rating

Bridge Snapshot: TP828

The TP828 bridge in Santa Fe, New Mexico carries TP828 over LOCAL DRAINAGE. It was built in 2020, making it 6 years old today. The structure is built primarily of steel and spans 3 sections, stretching 7.8 meters (26 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of New Mexico bridges. It is owned and maintained by Bureau of Indian Affairs.

The latest FHWA inspection records show culvert at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 89.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TP828 compares

▲ 55.0
Load rating vs New Mexico average (34.8 t)
Top 4%
Higher load rating than 96% of New Mexico bridges
15
Bridges in Santa Fe
TP828 89.8 t
New Mexico average 34.8 t

Live comparison across New Mexico.

Historical Sufficiency Rating

PlainBridge-computed
100.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Culvert
8/9
Good (7–9)
Inventory Load Rating
89.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2020
Material
Steel
Number of Spans
3
Structure Length
7.8 m (26 ft)
Deck Width
26.5 m (87 ft)
Owner
Bureau of Indian Affairs
Avg Daily Traffic
100 vehicles/day
Structure Number
0000M25719B0001

How to read this record

This page shows what the last federal inspection recorded, not whether TP828 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TP828 against other structures in Santa Fe and across New Mexico. New Mexico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TP828?

TP828 in Santa Fe, New Mexico on the FHWA's 0–9 scale.

How often is TP828 inspected?

TP828's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TP828 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TP828?

TP828 has an NBI inventory load rating of 89.8 metric tons.

Who is responsible for maintaining TP828?

TP828 is owned and maintained by Bureau of Indian Affairs.

How old is TP828 and does age affect safety?

TP828 was built in 2020, making it 6 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.