FHWA NBI 2024 Inspection record Public-domain dataset

V.0-8.0 Road 23

Carrying V.0-8.0 Road 23 over BACHELOR CRK

2.0E 5.0N OF SEDAN, Chautauqua, Kansas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: V.0-8.0 Road 23

The V.0-8.0 Road 23 bridge in Chautauqua, Kansas carries V.0-8.0 Road 23 over BACHELOR CRK. It was built in 1983, making it 43 years old today. The structure is built primarily of steel and spans 1 section, stretching 12.5 meters (41 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of Kansas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 26.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How V.0-8.0 Road 23 compares

▼ 2.8
Load rating vs Kansas average (29.1 t)
Bottom 47%
Lower load rating than 53% of Kansas bridges
130
Bridges in Chautauqua · 14 in Poor condition
V.0-8.0 Road 23 26.3 t
Kansas average 29.1 t

Live comparison across Kansas.

Historical Sufficiency Rating

PlainBridge-computed
81.1 / 100 - historical 80–100 band
Structural adequacy /55
40.1
Serviceability /30
28.0
Essentiality /15
15.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
26.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1983
Material
Steel
Number of Spans
1
Structure Length
12.5 m (41 ft)
Deck Width
7.6 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
10 vehicles/day
Structure Number
000100949006860

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether V.0-8.0 Road 23 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare V.0-8.0 Road 23 against other structures in Chautauqua and across Kansas. Kansas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for V.0-8.0 Road 23?

V.0-8.0 Road 23 in Chautauqua, Kansas has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is V.0-8.0 Road 23 inspected?

V.0-8.0 Road 23's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. V.0-8.0 Road 23 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for V.0-8.0 Road 23?

V.0-8.0 Road 23 has an NBI inventory load rating of 26.3 metric tons.

Who is responsible for maintaining V.0-8.0 Road 23?

V.0-8.0 Road 23 is owned and maintained by County Highway Agency.

How old is V.0-8.0 Road 23 and does age affect safety?

V.0-8.0 Road 23 was built in 1983, making it 43 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.