FHWA NBI 2024 Inspection record Public-domain dataset

Road 30

Carrying Road 30 over LAKE CREEK

0.2N OF NIOTAZE, Chautauqua, Kansas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
5 t Inventory load rating

Bridge Snapshot: Road 30

The Road 30 bridge in Chautauqua, Kansas carries Road 30 over LAKE CREEK. It was built in 1940, making it 86 years old today. It was last reconstructed in 1982, extending its service life. The structure is built primarily of steel continuous and spans 2 sections, stretching 8.8 meters (29 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Kansas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 5.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Road 30 compares

▼ 24.1
Load rating vs Kansas average (29.1 t)
Bottom 1%
Lower load rating than 99% of Kansas bridges
130
Bridges in Chautauqua · 14 in Poor condition
Road 30 5.0 t
Kansas average 29.1 t

Live comparison across Kansas.

Historical Sufficiency Rating

PlainBridge-computed
36.0 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
21.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
5.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1940
Last Reconstructed
1982
Material
Steel Continuous
Number of Spans
2
Structure Length
8.8 m (29 ft)
Deck Width
7.6 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
50 vehicles/day
Structure Number
000100963007023

Condition Analysis

  • At 3/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

Road 30 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare Road 30 against other structures in Chautauqua and across Kansas. Kansas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Road 30?

Road 30 in Chautauqua, Kansas has a deck rating of 3/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is Road 30 inspected?

Road 30's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Road 30 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Road 30?

Road 30 has an NBI inventory load rating of 5.0 metric tons.

Who is responsible for maintaining Road 30?

Road 30 is owned and maintained by County Highway Agency.

How old is Road 30 and does age affect safety?

Road 30 was built in 1940, making it 86 years old and last reconstructed in 1982.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.