FHWA NBI 2024 Inspection record Public-domain dataset

SR 1

Carrying SR 1 over CARDINAL GREENWAY

00.56 N US 35, Wayne, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating

Bridge Snapshot: SR 1

The SR 1 bridge in Wayne, Indiana carries SR 1 over CARDINAL GREENWAY. It was built in 1976, making it 50 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 47.7 meters (157 feet) end to end. Daily traffic averages 1,369 vehicles, placing it in the moderately-trafficked tier of Indiana bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 28.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 1 compares

▼ 7.1
Load rating vs Indiana average (35.6 t)
Bottom 21%
Lower load rating than 79% of Indiana bridges
342
Bridges in Wayne · 13 in Poor condition
SR 1 28.5 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
91.3 / 100 - historical 80–100 band
Structural adequacy /55
52.5
Serviceability /30
27.0
Essentiality /15
14.8
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
28.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1976
Material
Steel Continuous
Number of Spans
3
Structure Length
47.7 m (157 ft)
Deck Width
14.4 m (47 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,369 vehicles/day
Structure Number
000230

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

SR 1 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR 1 against other structures in Wayne and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 1?

SR 1 in Wayne, Indiana has a deck rating of 4/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SR 1 inspected?

SR 1's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,369 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 1 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 1?

SR 1 has an NBI inventory load rating of 28.5 metric tons.

Who is responsible for maintaining SR 1?

SR 1 is owned and maintained by State Highway Agency.

How old is SR 1 and does age affect safety?

SR 1 was built in 1976, making it 50 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.