FHWA NBI 2024 Inspection record Public-domain dataset

Pioneer

Carrying Pioneer over ELK CREEK

4.0N 8.3W OF HOWARD, Elk, Kansas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
15 t Inventory load rating

Bridge Snapshot: Pioneer

The Pioneer bridge in Elk, Kansas carries Pioneer over ELK CREEK. It was built in 1910, making it 116 years old today. The structure is built primarily of concrete continuous and spans 4 sections, stretching 18.3 meters (60 feet) end to end. Daily traffic averages 15 vehicles, placing it in the lower-traffic tier of Kansas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 15.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Pioneer compares

▼ 13.8
Load rating vs Kansas average (29.1 t)
Bottom 15%
Lower load rating than 85% of Kansas bridges
133
Bridges in Elk · 10 in Poor condition
Pioneer 15.3 t
Kansas average 29.1 t

Live comparison across Kansas.

Historical Sufficiency Rating

PlainBridge-computed
28.0 / 100 - historical 20–49.9 band
Structural adequacy /55
7.0
Serviceability /30
6.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
15.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1910
Material
Concrete Continuous
Number of Spans
4
Structure Length
18.3 m (60 ft)
Deck Width
4.8 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
15 vehicles/day
Structure Number
000250917606400

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

Pioneer is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare Pioneer against other structures in Elk and across Kansas. Kansas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Pioneer?

Pioneer in Elk, Kansas has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is Pioneer inspected?

Pioneer's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 15 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Pioneer is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Pioneer?

Pioneer has an NBI inventory load rating of 15.3 metric tons.

Who is responsible for maintaining Pioneer?

Pioneer is owned and maintained by County Highway Agency.

How old is Pioneer and does age affect safety?

Pioneer was built in 1910, making it 116 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.