FHWA NBI 2024 Inspection record Public-domain dataset

SR 525

Carrying SR 525 over POSSESSION SOUND

1.9 N JCT SR 526, Island, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
23 t Inventory load rating

Bridge Snapshot: SR 525

The SR 525 bridge in Island, Washington carries SR 525 over POSSESSION SOUND. It was built in 1987, making it 39 years old today. It was last reconstructed in 2000, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 32.0 meters (105 feet) end to end. Daily traffic averages 12,000 vehicles, placing it in the heavily-trafficked tier of Washington bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 22.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 525 compares

▼ 10.8
Load rating vs Washington average (33.5 t)
Bottom 25%
Lower load rating than 75% of Washington bridges
8
Bridges in Island
SR 525 22.7 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
55.2 / 100 - historical 50–79.9 band
Structural adequacy /55
35.2
Serviceability /30
10.0
Essentiality /15
15.0
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
22.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Last Reconstructed
2000
Material
Steel
Number of Spans
1
Structure Length
32.0 m (105 ft)
Deck Width
7.3 m (24 ft)
Owner
State Highway Agency
Avg Daily Traffic
12,000 vehicles/day
Structure Number
0004101A0000000

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 525 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 525 against other structures in Island and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 525?

SR 525 in Island, Washington has a deck rating of 7/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 525 inspected?

SR 525's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 12,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 525 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 525?

SR 525 has an NBI inventory load rating of 22.7 metric tons.

Who is responsible for maintaining SR 525?

SR 525 is owned and maintained by State Highway Agency.

How old is SR 525 and does age affect safety?

SR 525 was built in 1987, making it 39 years old and last reconstructed in 2000.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.