FHWA NBI 2024 Inspection record Public-domain dataset

SR 162

Carrying SR 162 over S PRAIRIE CR

15.3 E JCT SR 410, Pierce, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating

Bridge Snapshot: SR 162

The SR 162 bridge in Pierce, Washington carries SR 162 over S PRAIRIE CR. It was built in 1956, making it 70 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 36.6 meters (120 feet) end to end. Daily traffic averages 9,533 vehicles, placing it in the moderately-trafficked tier of Washington bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 29.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 162 compares

▼ 4.5
Load rating vs Washington average (33.5 t)
Bottom 45%
Lower load rating than 55% of Washington bridges
502
Bridges in Pierce · 18 in Poor condition
SR 162 29.0 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
66.9 / 100 - historical 50–79.9 band
Structural adequacy /55
53.0
Serviceability /30
8.0
Essentiality /15
6.9
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
29.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1956
Material
Concrete
Number of Spans
3
Structure Length
36.6 m (120 ft)
Deck Width
10.7 m (35 ft)
Owner
State Highway Agency
Avg Daily Traffic
9,533 vehicles/day
Structure Number
0005142A0000000

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

SR 162 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR 162 against other structures in Pierce and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 162?

SR 162 in Pierce, Washington has a deck rating of 4/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 162 inspected?

SR 162's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,533 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 162 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 162?

SR 162 has an NBI inventory load rating of 29.0 metric tons.

Who is responsible for maintaining SR 162?

SR 162 is owned and maintained by State Highway Agency.

How old is SR 162 and does age affect safety?

SR 162 was built in 1956, making it 70 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.