SR 27

Carrying SR 27 over ROCK CREEK

0.2 N JCT SR 278, Spokane, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
14 t Inventory load rating

Bridge Snapshot: SR 27

The SR 27 bridge in Spokane, Washington carries SR 27 over ROCK CREEK. It was built in 1957, making it 69 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 43.3 meters (142 feet) end to end. Daily traffic averages 5,655 vehicles, placing it in the moderately-trafficked tier of Washington bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 13.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 27 compares

▼ 19.6
Load rating vs Washington average (33.5 t)
Bottom 5%
Lower load rating than 95% of Washington bridges
360
Bridges in Spokane · 14 in Poor condition
SR 27 13.9 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
38.1 / 100 - historical 20–49.9 band
Structural adequacy /55
29.1
Serviceability /30
2.0
Essentiality /15
7.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
13.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1957
Material
Concrete Continuous
Number of Spans
3
Structure Length
43.3 m (142 ft)
Deck Width
10.2 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,655 vehicles/day
Structure Number
0005397A0000000

Condition Analysis

  • The deck (driving surface) is in poor condition (3/9), showing advanced deterioration that may require priority repair.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

SR 27 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR 27 against other structures in Spokane and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 27?

SR 27 in Spokane, Washington has a deck rating of 3/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 27 inspected?

SR 27's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,655 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 27 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 27?

SR 27 has an NBI inventory load rating of 13.9 metric tons.

Who is responsible for maintaining SR 27?

SR 27 is owned and maintained by State Highway Agency.

How old is SR 27 and does age affect safety?

SR 27 was built in 1957, making it 69 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.