FHWA NBI 2024 Inspection record Public-domain dataset

PLEASANT VAL.28.02

Carrying PLEASANT VAL.28.02 over TRIB. TO NINNESCAH RIVER

0.3W 1.0S OF CASTLETON, Reno, Kansas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
12 t Inventory load rating

Bridge Snapshot: PLEASANT VAL.28.02

The PLEASANT VAL.28.02 bridge in Reno, Kansas carries PLEASANT VAL.28.02 over TRIB. TO NINNESCAH RIVER. It was built in 1972, making it 54 years old today. The structure is built primarily of wood or timber and spans 3 sections, stretching 14.3 meters (47 feet) end to end. Daily traffic averages 13 vehicles, placing it in the lower-traffic tier of Kansas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 12.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PLEASANT VAL.28.02 compares

▼ 16.9
Load rating vs Kansas average (29.1 t)
Bottom 9%
Lower load rating than 91% of Kansas bridges
574
Bridges in Reno · 35 in Poor condition
PLEASANT VAL.28.02 12.2 t
Kansas average 29.1 t

Live comparison across Kansas.

Historical Sufficiency Rating

PlainBridge-computed
54.5 / 100 - historical 50–79.9 band
Structural adequacy /55
15.5
Serviceability /30
27.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
12.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1972
Material
Wood or Timber
Number of Spans
3
Structure Length
14.3 m (47 ft)
Deck Width
7.4 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
13 vehicles/day
Structure Number
000780751105960

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether PLEASANT VAL.28.02 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PLEASANT VAL.28.02 against other structures in Reno and across Kansas. Kansas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PLEASANT VAL.28.02?

PLEASANT VAL.28.02 in Reno, Kansas has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is PLEASANT VAL.28.02 inspected?

PLEASANT VAL.28.02's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PLEASANT VAL.28.02 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PLEASANT VAL.28.02?

PLEASANT VAL.28.02 has an NBI inventory load rating of 12.2 metric tons.

Who is responsible for maintaining PLEASANT VAL.28.02?

PLEASANT VAL.28.02 is owned and maintained by County Highway Agency.

How old is PLEASANT VAL.28.02 and does age affect safety?

PLEASANT VAL.28.02 was built in 1972, making it 54 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.