FHWA NBI 2026 Inspection record Public-domain dataset

VALLEY PRIDE 4.30

Carrying VALLEY PRIDE 4.30 over TRIB TO CHENEY RSRVR

3.5E OF PRETTY PRAIRIE, Reno, Kansas

FHWA NBI inspection record for this structure. Condition ratings, inventory load rating, span, deck width, and average daily traffic refresh annually with each NBI release.

Good
33 t Inventory load rating

Bridge Snapshot: VALLEY PRIDE 4.30

The VALLEY PRIDE 4.30 bridge in Reno, Kansas carries VALLEY PRIDE 4.30 over TRIB TO CHENEY RSRVR. It was built in 2017, making it 9 years old today. The structure is built primarily of steel and spans 4 sections, stretching 7.0 meters (23 feet) end to end. Daily traffic averages 30 vehicles, placing it in the lower-traffic tier of Kansas bridges. It is owned and maintained by County Highway Agency, the entity responsible for routine inspections and any needed repairs.

The latest FHWA inspection records show culvert at 7/9 on the 0–9 NBI scale, where 9 is excellent and 0 is failed. The weakest component sits in good condition, which drives the overall status of this bridge. No major component scores in the poor range, so the bridge is not classified as structurally deficient under federal criteria. Its NBI inventory load rating is 32.7 metric tons — the load level the structure is rated to carry at inventory (long-term) level.

In a county that maintains hundreds of NBI-tracked bridges, VALLEY PRIDE 4.30 is one data point in a Kansas inventory that FHWA inspects on a two-year cycle (more often when ratings fall). Bridge age alone is not a reliable safety signal — a 9-era structure can outperform a newer one when maintenance is consistent, materials are sound, and traffic loads stay within design limits. Use the condition ratings above, the sufficiency score, and the structurally-deficient flag together to read the bridge's real status, and check the linked county and state pages to see how this bridge ranks against its peers.

Every figure on this page comes directly from the Federal Highway Administration National Bridge Inventory (NBI), the public dataset that catalogs more than 617,000 highway bridges across the United States and is updated annually from the records that each state Department of Transportation submits to the FHWA. The condition codes use the standardized FHWA Recording and Coding Guide, the same scale that determines federal eligibility for the Highway Bridge Program and the Surface Transportation Block Grant set-aside for off-system bridges. A "structurally deficient" classification under those federal criteria is a maintenance and funding flag, never a closure order; states keep deficient bridges open with load posting, weight limits, or accelerated inspection cycles until rehabilitation or replacement is funded. See our methodology for refresh cadence and the exact NBI release vintage powering each record.

How VALLEY PRIDE 4.30 compares

▲ 3.6
Load rating vs Kansas average (29.1 t)
Top 40%
Higher load rating than 60% of Kansas bridges
574
Bridges in Reno · 35 structurally deficient
VALLEY PRIDE 4.30 32.7 t
Kansas average 29.1 t

NBI inventory load rating (metric tons) and structural-deficiency status compared across Kansas, computed live from the FHWA NBI.

Condition Ratings

Culvert
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
SD Status
Not SD

Ratings are on a 0–9 scale: 9 = Excellent, 7–8 = Good, 5–6 = Fair, 3–4 = Poor, 0–2 = Critical/Failed. Sufficiency rating (0–100) combines structural adequacy, functional obsolescence, and essentiality.

Structural Details

Year Built
2017
Material
Steel
Number of Spans
4
Structure Length
7.0 m (23 ft)
Deck Width
10.4 m (34 ft)
Owner
County Highway Agency
Avg Daily Traffic
30 vehicles/day
Structure Number
000780753006047

Location

3.5E OF PRETTY PRAIRIE, Reno, Kansas
37.782881, -97.955011
View on Google Maps ↗

Data Source

Data from the FHWA National Bridge Inventory (NBI). Bridge inspections are required every two years by federal law. Conditions reflect the most recent inspection.

FHWA NBI Program ↗

Frequently Asked Questions

What do the condition ratings mean for VALLEY PRIDE 4.30?

Bridge condition ratings use a 0–9 scale set by the Federal Highway Administration (FHWA). Ratings 7–9 indicate good condition with no significant problems. Ratings 5–6 mean fair condition with minor issues. Ratings 3–4 indicate poor condition requiring repair. Ratings 0–2 are critical, meaning the bridge has serious structural problems. VALLEY PRIDE 4.30 in Reno, Kansas.

How often is VALLEY PRIDE 4.30 inspected?

Federal law requires most highway bridges to be inspected at least every 24 months. Bridges in poor condition or with known issues may be inspected more frequently (every 12 months or less). VALLEY PRIDE 4.30 is part of the National Bridge Inventory maintained by the FHWA. With 30 vehicles crossing daily, regular inspection is essential.

What does "structurally deficient" mean for a bridge?

A structurally deficient bridge has at least one major component (deck, superstructure, or substructure) rated 4 or below on the FHWA 0–9 scale. This classification does NOT mean the bridge is unsafe for travel — it means the bridge needs repair, rehabilitation, or eventual replacement. Structurally deficient bridges remain open and are monitored. VALLEY PRIDE 4.30 is not classified as structurally deficient.

What is the inventory load rating for VALLEY PRIDE 4.30?

The NBI inventory rating is the load level a bridge is rated to carry for an indefinite period, recorded in metric tons. A lower number means the structure is more load-restricted. VALLEY PRIDE 4.30 has an inventory load rating of 32.7 metric tons. It is distinct from the FHWA sufficiency rating, a separate 0–100 funding-eligibility score that this dataset does not include.

Who is responsible for maintaining VALLEY PRIDE 4.30?

Bridge ownership and maintenance responsibility varies — bridges may be owned by state DOTs, counties, cities, railroads, or federal agencies. VALLEY PRIDE 4.30 is maintained by County Highway Agency. The FHWA oversees the National Bridge Inventory program and sets inspection standards, but day-to-day maintenance falls to the owning agency. If you notice damage or safety concerns, contact your state DOT or call 911 for emergencies.

How old is VALLEY PRIDE 4.30 and does age affect safety?

VALLEY PRIDE 4.30 was built in 2017, making it 9 years old. Bridge age alone does not determine safety — condition depends on materials, design, traffic load, maintenance history, and environmental exposure. Many older bridges remain in good condition due to regular maintenance and reconstruction.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A structurally deficient rating does not mean a bridge is closed or unsafe for travel — it indicates the bridge requires repair or replacement. For current closure or safety information, contact your state DOT.

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial