FHWA NBI 2024 Inspection record Public-domain dataset

PR 123

Carrying PR 123 over EL MUERTO CREEK

4 KM NORTH OF UTUADO, Utuado, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
34 t Inventory load rating

Bridge Snapshot: PR 123

The PR 123 bridge in Utuado, Puerto Rico carries PR 123 over EL MUERTO CREEK. It was built in 1892, making it 134 years old today. The structure is built primarily of steel and spans 1 section, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 5,000 vehicles, placing it in the moderately-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 34.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PR 123 compares

▼ 2.1
Load rating vs Puerto Rico average (36.1 t)
Top 48%
Higher load rating than 52% of Puerto Rico bridges
57
Bridges in Utuado · 12 in Poor condition
PR 123 34.0 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
37.5 / 100 - historical 20–49.9 band
Structural adequacy /55
30.0
Serviceability /30
7.5
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
34.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1892
Material
Steel
Number of Spans
1
Structure Length
9.8 m (32 ft)
Deck Width
5.2 m (17 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,000 vehicles/day
Structure Number
001571

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

PR 123 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PR 123 against other structures in Utuado and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 123?

PR 123 in Utuado, Puerto Rico has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is PR 123 inspected?

PR 123's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 123 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 123?

PR 123 has an NBI inventory load rating of 34.0 metric tons.

Who is responsible for maintaining PR 123?

PR 123 is owned and maintained by State Highway Agency.

How old is PR 123 and does age affect safety?

PR 123 was built in 1892, making it 134 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.