FHWA NBI 2024 Inspection record Public-domain dataset

PR 119

Carrying PR 119 over ARENAS RIVER

1.5 KM WEST OF LAS MARIAS, Las Marías, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
16 t Inventory load rating

Bridge Snapshot: PR 119

The PR 119 bridge in Las Marías, Puerto Rico carries PR 119 over ARENAS RIVER. It was built in 1905, making it 121 years old today. It was last reconstructed in 1975, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 11.3 meters (37 feet) end to end. Daily traffic averages 5,700 vehicles, placing it in the moderately-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 15.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PR 119 compares

▼ 20.5
Load rating vs Puerto Rico average (36.1 t)
Bottom 16%
Lower load rating than 84% of Puerto Rico bridges
13
Bridges in Las Marías · 1 in Poor condition
PR 119 15.6 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
29.6 / 100 - historical 20–49.9 band
Structural adequacy /55
7.6
Serviceability /30
19.0
Essentiality /15
3.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
15.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1905
Last Reconstructed
1975
Material
Steel
Number of Spans
1
Structure Length
11.3 m (37 ft)
Deck Width
11.6 m (38 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,700 vehicles/day
Structure Number
002531

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

PR 119 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PR 119 against other structures in Las Marías and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 119?

PR 119 in Las Marías, Puerto Rico has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is PR 119 inspected?

PR 119's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,700 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 119 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 119?

PR 119 has an NBI inventory load rating of 15.6 metric tons.

Who is responsible for maintaining PR 119?

PR 119 is owned and maintained by State Highway Agency.

How old is PR 119 and does age affect safety?

PR 119 was built in 1905, making it 121 years old and last reconstructed in 1975.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.